Context

A PMO in a government entity that needs an annual operational plan measured every quarter, at office level and at section level.

Challenge

Link the PMO's quarterly activities to measurable objectives and key results, with indicators that measure outcomes rather than task completion, and activities built on existing practices rather than theoretical ones.

How the work ran

  1. Diagnose

    The previous quarter's results review as the basis for the next quarter's plan, and an inventory of existing operational practices: the monthly project status report, supplier evaluation forms, the deviation tracking log, and the electronic project management system.

  2. Design

    Five office-level objectives with three key results each, and nine key results at section level.

  3. Build

    An operational plan of 55 quarterly activities with weights totaling 100%, 6 KPIs, 4 risks and challenges, and a matrix linking key results to KPIs.

  4. Measure

    Uniform measurement rules: a key result with a numeric target is recorded as its achievement ratio (actual ÷ target) with the actual value shown, and disbursement-plan compliance is the quarter's actual disbursement ÷ the quarter's plan.

Outputs

  • The PMO's annual operational plan
  • Quarterly OKR plan for the office and the section
  • Key result to KPI linkage matrix
  • Quarterly measurement rules

What the organization can now do

The PMO's plan is now measured every quarter with uniform rules, and every activity in it is linked to a key result and a KPI and built on an existing practice.

OKR is a methodology for managing periodic objectives; KPIs are measurement tools.